Search results

1 – 7 of 7
Article
Publication date: 14 March 2022

Ayman Mashali, Emad Elbeltagi, Ibrahim Motawa and Mohamed Elshikh

The construction industry is facing massive challenges due to the huge construction development, and stakeholder management (SM) practices, especially on megaprojects. The purpose…

1388

Abstract

Purpose

The construction industry is facing massive challenges due to the huge construction development, and stakeholder management (SM) practices, especially on megaprojects. The purpose of this paper is to investigate critical success factors (CSFs) encountered by key construction stakeholders to enhance SM practices on mega construction projects (MCPs).

Design/methodology/approach

A questionnaire survey is carried out among the most important construction companies in Qatar. Three steps are used to finalize and evaluate the questionnaire before proceeding with the full survey, validity, pretesting and pilot study. Quantitative data analysis was conducted using the Statistical Package for Social Science software.

Findings

This paper identifies the key factors contributing to improving SM performance in MCPs; none of these is uncommon, but here they come together in a more integrative way.

Research limitations/implications

The limitations related to this research are briefly outlined as follows: the research was carried out in the State of Qatar. So, the findings are limited to the Qatari construction industry. The construction industry in Qatar is different from other countries where public projects have the priority to develop the infrastructure of the country prior to the world cup competition. The scope of this research is limited to MCPs. The impact of low awareness and knowledge of SM is not considered. However, the study is still reasonable and fortunately suitable to evaluate SM in MCPs.

Practical implications

Identifying these factors is expected to assist project participants in MCPs in improving projects’ performance and completing construction within the predefined time and cost.

Originality/value

This study makes a significant contribution through identifying the CSFs that lead to develop efficient SM in MCPs. Moreover, the research findings are important for project stakeholders, organizations, contractors, engineers and local authorities who implement SM in MCPs. Moreover, it will enhance the application of SM practices in construction megaprojects and allow project key stakeholders to place emphasis on tackling the crucial challenges identified in this research.

Details

Journal of Engineering, Design and Technology , vol. 21 no. 2
Type: Research Article
ISSN: 1726-0531

Keywords

Article
Publication date: 29 January 2021

Martin Evans, Peter Farrell, Wael Zewein and Ayman Mashali

The construction industry encounters substantial challenges in its evolution towards sustainable development and to the adoption of building information modelling (BIM) technology…

Abstract

Purpose

The construction industry encounters substantial challenges in its evolution towards sustainable development and to the adoption of building information modelling (BIM) technology and lean construction (LC) practices on construction mega-projects. This study aims to present critical challenges and to investigate the interactions of BIM and LC on construction mega-projects encountered by key stakeholders in their efforts to integrate BIM and LC.

Design/methodology/approach

A qualitative research approach is adopted to introduce and validate LC principles and BIM functionalities resulting from a detailed analysis of extant literature, followed by a conceptual analysis of the interactions between BIM and LC on construction mega-projects. A quantitative questionnaire survey is then used. Descriptive and inferential statistical tests are used for data analysis, and analysis of variance tests elaborate and validate results.

Findings

The research yielded ten BIM functionalities and ten LC principles, which are categorised in four principle areas and four BIM functionality groups. A research framework for analysis of the interaction between BIM and LC is then compiled.

Originality/value

Research findings and the proposed framework will enhance the adoption of BIM and LC practices on construction mega-projects and allow project key stakeholders to place emphasis on tackling crucial challenges and barriers identified in this research. The framework will guide and stimulate research; and as such, the approach adopted up to this point is constructive. The identified interactions between BIM and LC on construction mega-projects show positive synergies between the two.

Details

Journal of Engineering, Design and Technology , vol. 19 no. 6
Type: Research Article
ISSN: 1726-0531

Keywords

Article
Publication date: 24 September 2020

Martin Evans, Peter Farrell, Ayman Mashali and Wael Zewein

The purpose of this paper is to investigate critical success factors (CSFs) that enhance integration between building information modelling (BIM) and lean construction (LC…

1012

Abstract

Purpose

The purpose of this paper is to investigate critical success factors (CSFs) that enhance integration between building information modelling (BIM) and lean construction (LC) practices on construction mega-projects. BIM and LC have gained momentum in the past decade.

Design/methodology/approach

The Delphi survey technique was used to gauge opinions of a panel of 16 experts through a two-round Delphi questionnaire survey. Panel responses were scrutinised using inferential and descriptive statistical techniques.

Findings

In total, 30 CSFs were identified in the literature. The top ranked factor out of 30 that supports LeanBIM synergy was “collaboration in design, construction works and engineering management”. Other top rated CSFs were centric on people, data and technology elements. The research findings are important for project stakeholders, organisations, contractors, engineers and local authorities who implement LC and BIM synergies in construction mega-projects.

Originality/value

The research findings are important for project stakeholders, organisations, contractors, engineers and local authorities who implement LC and BIM synergies in construction mega-projects. The research recommends further hands-on training to increase the integration of BIM and LC practices in the architecture, engineering and construction industry and to enrich the extant body of knowledge in construction of mega-projects.

Details

Journal of Engineering, Design and Technology , vol. 19 no. 2
Type: Research Article
ISSN: 1726-0531

Keywords

Content available
Article
Publication date: 24 March 2023

David Oloke and David Heesom

248

Abstract

Details

Journal of Engineering, Design and Technology , vol. 21 no. 2
Type: Research Article
ISSN: 1726-0531

Article
Publication date: 3 August 2021

Martin Evans, Peter Farrell, Emad Elbeltagi and Helen Dion

The architecture, engineering and construction (AEC) industry encounter substantial risks and challenges in its evolution towards sustainable development. International…

1140

Abstract

Purpose

The architecture, engineering and construction (AEC) industry encounter substantial risks and challenges in its evolution towards sustainable development. International businesses, multinational AEC organisations, technical professionals, project and portfolio management organisations face global connectivity challenges between business units, especially during the outbreak of novel coronavirus pandemic, to manage construction megaprojects (CMPs). That raises the need to manage global connectivity as a main strategic goal of global organisations. This paper aims to investigate barriers to integrating lean construction (LC) practices and integrated project delivery (IPD) on CMPs towards the global integrated delivery (GID) transformative initiatives and develop future of work (FOW) global initiatives in contemporary multinational AEC organisations.

Design/methodology/approach

A two-stage quantitative and qualitative research approach is adopted. The qualitative research methodology consists of a literature review to appraise barriers to integrating LeanIPD&GID on CMPs. Barriers are arranged into six-factor clusters (FCs), with a conceptualisation of LeanIPD&GID, GID strategy placements and FOW global initiatives with multiple validations. This analysis also involved semi-structured interviews and focus group techniques. Stage two consisted of an empirical questionnaire survey that shaped the foundation of analysis and findings of 230 respondents from 23 countries with extensive cosmopolitan experience in the construction of megaprojects. The survey examined a set of 28 barriers to integrating LeanIPD&GID on CMPs resulting from a detailed analysis of extant literature after validation. Descriptive and inferential statistical tests were exploited for data analysis, percentage scoring analysis, principal component analysis (PCA) and eigenvalues were used to elaborate on clustered factors.

Findings

The research conceptualised LeanIPD&GID principles and proposed GID strategy placements for LeanIPD&GID transformative initiatives and FOW global initiatives. It concluded that the most significant barriers to integration of LeanIPD&GID on CMPs are “lack of mandatory building information modelling (BIM) and LC industry standards and regulations by governments”, “lack of involvement and support of governments”, “high costs of BIM software licenses”, “resistance of industry to change from traditional working practices” and “high initial investment in staff training costs of BIM”. PCA revealed the most significant FCs are “education and knowledge-related barriers”, “project objectives-related barriers” and “attitude-related barriers”. Awareness of BIM in the Middle East and North Africa (MENA) region is higher than LC and LC awareness is higher than IPD knowledge. Whilst BIM adoption in the MENA region is higher than LC; the second is still taking its first steps, whilst IPD has little implementation. LeanBIM is slightly integrated, whilst LeanIPD integration is almost not present.

Originality/value

The research findings, conclusion and recommendation and proposed GID strategy placements for LeanIPD&GID transformative initiatives to integrating LeanIPD&GID on CMPs. This will allow project key stakeholders to place emphasis on tackling LeanIPD&GID barriers identified in this research and commence GID strategies. The study has provided effective practical strategies for enhancing the integration of LeanIPD&GID transformative initiatives on CMPs.

Details

Journal of Engineering, Design and Technology , vol. 21 no. 3
Type: Research Article
ISSN: 1726-0531

Keywords

Article
Publication date: 30 October 2020

Martin Evans and Peter Farrell

The construction industry encounters substantial challenges in its evolution towards sustainable development and in the adoption of building information modelling (BIM) technology…

1724

Abstract

Purpose

The construction industry encounters substantial challenges in its evolution towards sustainable development and in the adoption of building information modelling (BIM) technology and lean construction (LC) practices on construction mega-projects. This research aims to investigate the critical barriers encountered by key construction stakeholders in their efforts to integrate BIM and LC in the construction mega-projects.

Design/methodology/approach

A two-round Delphi survey shaped the foundation of aggregating consensus between an expert panel that examined a set of 28 barriers resulting from a detailed analysis of the extant literature. Descriptive and inferential statistical tests were exploited for data analysis, and interrater agreement analysis was used to elaborated and validate results.

Findings

The research concluded that the key barriers by descending order of significance are lack of mandatory BIM and LC industry standards and regulations by the government, resistance of the industry to change from traditional practices to LeanBIM, high cost of software licenses and training and running of BIM.

Originality/value

The research findings and the proposed mitigation strategy will enhance the application of BIM and LC practices in construction mega-projects and allow project key stakeholders to place emphasis on tackling the crucial challenges and barriers identified in this research.

Details

Benchmarking: An International Journal, vol. 28 no. 2
Type: Research Article
ISSN: 1463-5771

Keywords

Article
Publication date: 4 January 2024

Ayman Abdalmajeed Alsmadi

This study aims to present a research model to investigate the potential impact of human capital, structural capital and social capital on e-banking proactiveness. In addition, it…

Abstract

Purpose

This study aims to present a research model to investigate the potential impact of human capital, structural capital and social capital on e-banking proactiveness. In addition, it reveals the potential impact of e-banking proactiveness on competitive intelligence and competitive agility. Also, it aims to explore the impact of competitive intelligence on competitive advantage and competitive agility. Finally, the impact of competitive agility on competitive advantage will be examined.

Design/methodology/approach

In order to gather data, a questionnaire was prepared and administered to 211 respondents in Jordan. The research model and hypotheses were then assessed using Structural Equation Modeling – Partial Least Squares (SEM-PLS).

Findings

The study demonstrated a significant impact of human capital, structural capital and social capital on e-banking proactiveness. The findings confirm that e-banking proactiveness significantly impacts competitive intelligence and achieving competition. Moreover, the findings confirm that competitive intelligence significantly impacts competitive agility. Also, the findings revealed a substantial relationship between competitive intelligence and competitive advantage. Finally, the results discovered that competitive agility significantly impacts competitive advantage.

Originality/value

The research gives valuable insights into the elements that drive e-banking proactiveness, which can beautify the proactiveness literature is well-known. By uncovering the position of intellectual capital in fostering proactiveness, this examination contributes to deeper information on the way financial institutions can successfully respond to market modifications, patron needs and technological advancements. Future scholars can build upon these findings to discover proactiveness in different sectors and industries, thereby broadening the understanding of proactive behaviors throughout numerous contexts.

Details

Kybernetes, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0368-492X

Keywords

1 – 7 of 7